Dudgeon
Transmission Capital Partners was declared the preferred bidder for the Dudgeon offshore transmission licence on the 23rd November 2017. We have established TC Dudgeon OFTO Plc as a special purpose company to own the transmission assets and hold the transmission licence.
TC Dudgeon OFTO Plc was awarded a transmission licence on the 6th November 2018 and took ownership of the assets on the 13th November 2018. The transfer value of the assets was £298m.
The project connects the 402MW Dudgeon windfarm located 32km off the Norfolk coast to National Grid’s 400kV substation at Necton near Swaffham, Norfolk; via 89km route kilometres of twin circuit 132kV subsea and land cables including the associated onshore and offshore substations.
Downloadable Documents
Basis of Charging Statement 2021/2022 [download]
Basis of Charging Statement 2022/2023 [download]
Compliance Statement [download]
Compliance Report – 31 March 2020 [download]
Compliance Report – 31 March 2021 [download]
Dudgeon Bond Holders
Dudgeon Bond Holders please click here
DUDGEON BOND HOLDERS
|